Kynatx
Free forever for trainees

Train, coach and run your gym in one app.

Kynatx is a workout tracker that works with no signal at all, a full client platform for coaches and nutritionists, and a management system for gyms. One login, whichever of those you are.

Exercises built in
1,900+

Exercises built in

Works offline
100%

Works offline

To track your training
$0

To track your training

Apps in one
3

Apps in one

The Kynatx workout screen, showing today's session ready to start
PowerliftingHypertrophyMobilityWeight lossPost-natalOlympic liftingSports nutritionCalisthenicsRehabCrossFitMarathon prepStrength & conditioning

One app, three jobs

Whoever you are in the gym, it already fits

Switch between the trainee view and your professional dashboard from the drawer. Never two apps, never two logins.

  1. 01

    If you train

    Log sets, follow a plan, watch your lifts go up. Everything lives on your phone, so a basement gym with no bars of signal changes nothing.

    See what it tracks
  2. 02

    If you coach

    Programs, nutrition plans, video calls, bookings and payments for every client you have, plus their real training history if they share it.

    For coaches
  3. 03

    If you run a gym

    Members, memberships, check-in, classes, point of sale, stock and staff shifts, in a dashboard your front desk can actually use.

    For gyms

What it actually looks like

Four screens you will use every week

Not a mockup and not a marketing render. These are the real screens, from the app on the store.

During the session

Log a set without leaving the bar

Weight, reps, done. The app remembers what you lifted last time for that exercise on that plan and puts it in front of you, so the only thing to decide is whether today goes up.

Logging sets in the Kynatx workout screen

Before the session

The week, already laid out

Assign a workout to each day and the app tells you what today is. Rest days are rest days. Move something and nothing else breaks.

The weekly training schedule in Kynatx

After a few months

Numbers that actually move

Every set you log feeds the charts. Personal bests, volume per muscle group, and a streak that counts the days you were meant to train rather than every day on the calendar.

Progress charts and earned badges in Kynatx

If you coach

Run your clients from the same app

Bookings, sessions and the diary sit in the professional side of the same login. Switch between training yourself and coaching from the drawer.

The coaching schedule in Kynatx

What you get

Everything a serious training app should already do

No paywalled rest timer, no advert between your sets, no subscription to see last week's numbers.

Genuinely offline

Your training is stored on your device first. Sync is a bonus, not a requirement — and logging out never touches what is already there.

Progression that suggests

It reads your last session and proposes the next weight and reps, so you are not doing arithmetic between sets.

Plans and schedules

Build a weekly split, follow one your coach assigned, and get a reminder when today is a training day.

Nutrition that is actually followed

Meal plans with per-day macro targets, swaps when you hate an option, and a grocery list derived from the week.

Coaching over video

Your coach runs the session from their side — the exercise, the set, your rest timer — and writes it up afterwards.

Talk to your coach

Chat, comments on individual workouts, and a shared record of what was agreed. Not another WhatsApp thread to lose.

Your data stays yours

A professional sees your history only while you allow it, and you can switch that off per coach without ending the relationship.

Pay how you actually pay

Card through Stripe, or Whish Pay for Lebanon. Gyms and coaches can also settle by bank transfer.

Built for a real gym floor

Barcode scanning, receipt printing, offline check-in. The front desk keeps working when the internet does not.

Directory

Coaches taking clients right now

Every professional here works with their clients inside Kynatx — programs, nutrition and check-ins in the same place you train.

Questions

The things people ask first

Start training tonight

Free forever, works with no signal, and nothing to cancel. Download it and log your first set.

Open Kynatx in your browser